Radial 3, Radial 5 motorways and M50 highway section between A6 motorway and the M409 road
|
|
|
Concession details
Location: |
Spain |
Concessionaire Company: |
Concesionaria Espaņola, SA |
Stake: |
19.72 % |
Size of investment: |
€1.655 billion |
Contract term: |
1999 - 2049 |
Toll system: |
Real Toll Motorway |
Link: |
www.accesosdemadrid.es |
Project description: Public works concession contract to build, maintain and toll manage the R-3 motorway from Madrid to Arganda del Rey and the R-5 from Madrid to Navalcarnero. It also includes construction of the section of the M-50 between the A-6 motorway and the M-409, with a total length of 90.23km, and operation of the motorway's service areas as set out by law. The contract is for 50 years. A toll-free section of the motorway opened to traffic on 21 December 2003, and it came into full operation on 16 June 2004. |
|
|
|