Project description: Public works concession contract for 36 years (which may be extended to 40) for construction, maintenance and operation of the Alicante Bypass toll motorway, the toll-free El Campello road and the third lane of the toll-free A-7 motorway, between Elche and Crevillente; maintenance and operation of the toll-free Camino de Castilla road; and construction of the following toll-free works: adaptation and upgrading of the section of the Levante Corridor (N-330) between Alicante and the border with the province of Albacete; Elche-Crevillente, approach roads to Crevillente from the north and south; the East Elche road; and Torrellano-Alicante, Camino Viejo de Elche. The total length of these is 148km, of which 33.2km is toll motorway. The motorway began operating in December 2007. |