Contact  |  Terms and Conditions  |  Search:    
Current Portfolio Experience All



 Bakwena
 Concession details
 Location: South Africa
 Concessionaire Company: Bakwena Platinum Corridor Concessionaire (Pty) Ltd
 Stake: 25% (Bakwena)
Stake sold in September 2010
 Size of investment: Rands 4.209 millon
 Contract term: 28/08/2001 – 28/08/2031
 Toll system: Real Toll Motorway
 Link: www.bakwena.co.za
 Project description: Public works concession contract for the building, financing and operation of the Platinum Toll Highway. The contract covers a section of the N4 linking Pretoria to the west with the Botswana border (290km) and a section of the National 1 (N1) running north from Pretoria to Warmbaths (90km). The project includes expansion and/or improvement of existing sections and construction of new sections on the N4, where it connects with the N1 and the Rustemburg Road. It is 381km long and was put into operation on March 2002.

perform another search
Select a country from the list to see the concessions in which we are participating, are going to participate or have participated.
 view images

click to enlarge
Home | Iridium | Business Lines | Concessions | Quality | Environment | News | Contact | Terms and Conditions | Compliance | Tax Strategy UK

© 2024 Iridium. All rights reserved. Developed by Ideamina