Jonica Motorway (NEA ODOS)
|
|
|
Concession details
Location: |
Greece |
Concessionaire Company: |
Nea Odos Concessionaire, S.A. |
Stake: |
33.33% |
Size of investment: |
€1.115 billion |
Contract term: |
19/12/2007 - 2037 |
Toll system: |
Real Toll Motorway |
Project description: Public works concession contract for the design, building, financing, operation and maintenance of the IONIA ODOS MOTORWAY FROM ANTIRIO TO IOANINA, PATHE MOTORWAY ATHENS (METAMORFOSSI I/C) – MALIAKOS (SKARFIA) AND PATHE CONNECTING BRANCH SCHIMATARI – CHALKIDA. The project includes the closed-toll system Ionia Odos motorway, with an approximate length of 196km from Antirio to the Egnatia Odos junction, and the open-toll system section of the Pathe motorway with an approximate total length of 172.5km from the Metamorphossi junction to the Skarfia junction, including the connecting branch from Schimatari to Chalkida with a length of 11km. The total length of motorway is 379.5km. The contract is for a period of 30 years. |
|
|
|