Location

Valladolid, Spain

Investment Value

€97 Million

Concessionaire

Autovía de los Pinares

Contract Term

35

Years

Delivery model

Design-Build-Finance-Operate-Maintain

The Autovía de los Pinares includes the design, construction, operation, and maintenance of 43.5 km of the northern section of the Valladolid-Segovia (CL-601) and the intersection with CL-600 – southern access to Cuellar (link with SG-205). It includes the operation of 43.5 km of road under shadow tolls. The section corresponds to the duplication of the carriageway of CL-601 from its junction with CL-600, to the southern access to Cuéllar. The operation will be carried out by means of a shadow toll and has a duration of 35 years.

Website: www.autoviadelospinares.com

km roadway
0

Other Projects