The project includes the design, build, finance, and operations of the M7/M8 Portlaoise Bypass in the midlands of Ireland. Work included the construction of 41 km of toll roads, 3 km of link road, and 15 km of service roads; three grade separated junctions; an interchange between M7 and M8; 46 principal structures, and over 120 box/pipe culverts; four significant river crossings, including the 136-meter viaduct over the River Nore and the 72-meter 3-span River Goul Bridge; five new railway bridges, one railway bridge widening, and numerous gantries.
Website: www.crg.ie




