The A21 – Autovía del Pirineo includes the design, construction, finance, operation, and maintenance of 45km of the Autovía del Pirineo – Pyrenean Dual Carriageway (Navarra). The dual carriageway will be divided in Navarra into six sections. The project includes the execution and operation of Section 4: Venta de Judas-Yesa (10.2 km) and Section 5: Yesa-L.P. Zaragoza (6.5 km). The contract also includes the operation and conservation of all the already executed or being executed sections, with the concessionaire being responsible for their adequate maintenance during the concession term.
Website: www.autoviadelpirineo.com








