The Lima Metro Line 2 includes the design, construction, finance, operation, and maintenance of the 35 km rail segment between Ate and El Callao and the branch between Avenida Faucett and Avenida Gambetta in the Lima-Callao basic metro network in Chile. Line 2 will cross the Peruvian capital from east to west, linking the district of Ate with El Callao in 45 minutes. The Avenida Faucett–Avenida Gambetta branch will connect Line 2 with Lima’s Jorge Chávez International Airport. The project involves the construction of a total of 35 km of tunnel and 25 passenger stations, and includes the electromechanical equipment, railway systems, and electricity supply required for the metro’s operation. The metro line is expected to carry more than 200 million passengers a year.
First Automatic Underground Transit System & Largest Transportation P3 Project in Peru
Biggest Transit Project in Andean Region
Largest RPI-CAO P3 Project Bond in Latin America
First RPI-CAOs securitization backed by a syndicated loan in Peru