The contract includes the design, construction, operation, maintenance, and rehabilitation of the Santiago Brión (AG-56) highway and the Pardiñas-As Galanas corridor. The total system is 16 km.
Website: www.sanbrion.com
The contract includes the design, construction, operation, maintenance, and rehabilitation of the Santiago Brión (AG-56) highway and the Pardiñas-As Galanas corridor. The total system is 16 km.
Website: www.sanbrion.com


